Analysis of Addendum Contracts on Settlement Construction of WTP Construction Project in Aceh Tengah, According to The Concept of Ijarah 'Ala Al-Amal

Alwafi Hafizhan Asza, 200102173 (2026) Analysis of Addendum Contracts on Settlement Construction of WTP Construction Project in Aceh Tengah, According to The Concept of Ijarah 'Ala Al-Amal. Al-Mudharabah: Jurnal Ekonomi dan Keuangan Syariah, 7 (1). pp. 251-263. ISSN 2829-3665

[thumbnail of Proyek IPAL, Kontrak Addendum, Fiqih Muamalah, Ijārah ‘Ala Al-‘Amāl, Aceh Tengah] Text (Proyek IPAL, Kontrak Addendum, Fiqih Muamalah, Ijārah ‘Ala Al-‘Amāl, Aceh Tengah)
Artikel alwafi watermark.pdf - Published Version
Available under License Creative Commons Attribution.

Download (619kB)

Abstract

The construction of the Wastewater Treatment Plant (WWTP) in Aceh Tengah Regency is a strategic government project implemented through a construction service contract between the P2P Work Unit as the project owner and PT Meudang Pirak as the service provider. During its implementation, the project encountered various technical and non-technical constraints that resulted in contract changes through three addendum contracts. This condition raised legal issues regarding the validity of the addendum contracts under both positive law and the perspective of Islamic jurisprudence (fiqh muamalah), particularly within the framework of the ijārah 'ala al-'amāl contract. Therefore, the research problems of this study focus on the validity of the main contract and its addendums in the Aceh Tengah WWTP project and their conformity with the principles of ijārah 'ala al-'amāl. This study employs a qualitative method with a descriptive-analytical approach through library research by examining contract documents, statutory regulations, and relevant fiqh muamalah literature. The findings indicate that all addendum contracts implemented constitute legally valid contractual adjustments from administrative, juridical, and sharia perspectives, as they do not eliminate the pillars and conditions of the ijārah contract. Instead, the addendums function to maintain contractual continuity, ensure clarity of the work object, guarantee certainty of ujrah (wages), and realize the principles of justice and public benefit (maṣlaḥah). Accordingly, the main contract and its addendums in the Aceh Tengah WWTP project are deemed valid and consistent with both positive law and Islamic jurisprudence.

Item Type: Article
Keywords (Kata Kunci): Proyek IPAL, Kontrak Addendum, Fiqih Muamalah, Ijārah ‘Ala Al-‘Amāl, Aceh Tengah.
Subjects: 200 Religion (Agama) > 2X0 Islam > 2X4 Fiqih > 2X4.2 Mu'amalat
200 Religion (Agama) > 2X0 Islam > 2X4 Fiqih > 2X4.2 Mu'amalat > 2X4.231 Perburuhan
Divisions: Fakultas Syariah dan Hukum > S1 Hukum Ekonomi Syariah
Depositing User: Alwafi Hafizhan Asza
Date Deposited: 16 Jul 2026 02:47
Last Modified: 16 Jul 2026 02:49
URI: https://repository.ar-raniry.ac.id/id/eprint/58467

Actions (login required)

View Item
View Item